Freight Lift Installation

Freight Lift Installation
Client: Evergreen Pasuruan Plant
Location: Pasuruan Industrial Estate Rembang (PIER)

Freight Lift Installation

Freight Lift Installation – Evergreen Pasuruan Plant

Client: Evergreen Pasuruan Plant
Location: Pasuruan Industrial Estate Rembang (PIER), Pasuruan, East Java, Indonesia
Project Duration: 
Lift Specifications:

Unit 1: 1 unit Freight Lift, capacity 2000 kg, serving 6 floors/6 doors, with a speed of 30 meters per minute.

Unit 2: 2 units Freight Lift, each with a capacity of 2000 kg, serving 3 floors/3 doors, with a speed of 30 meters per minute.

Scope of Work:

GMN Energy was appointed to design, supply, install, and commission the freight lift systems at Evergreen Pasuruan Plant. The project aimed to enhance the efficient vertical transportation of goods within the plant, optimizing the operational workflow and supporting the plant's logistics requirements.

Outcome:

The freight lift systems were successfully installed and integrated into the plant's infrastructure, enabling efficient goods transportation between floors. GMN ensured full compliance with safety standards and operational guidelines, providing a reliable vertical transportation solution tailored to the plant's needs.