Our Project
WORK REFERENCES
PLTS NTT Client : Pemerintah Provinsi Nusa Tenggara Timur Dinas Energi dan Sumber Daya Mineral Kapacity : 120 kWp and 40 kWp Date : 16 May 2023 - 12 November 2023 Location : Sumba Timur, NTT
PJUTS INDO 2 Client : EBTKE Kementerian ESDM Capacity : 1.816,15 kWp Date : 12 May 2023 - 31 December 2023 Location : Wilayah Indonesia 2
Solar 2 Wave - Floating PV Client : Innovate UK Date : 1 March 2023 - Present Location : Gili Ketapang Island, East Java
Lift Installation Client : Yayasan Adzkia Sumatera Barat Date : 14 July 2022 - 14 February 2023 Location : Padang, West Sumatera
Tower ZTE/VIP Client : PT. ZTE Indonesia Date : 6 July 2023 - Present Location : Jabodetabek, Sulawesi dan Kalimantan
PLTS Kep. Riau Client : PT. Surya Energi Indotama Capacity : 715 kWp Date : 4 April 2023 - 9 October 2023 Location : Riau Islands
PLTS Client : GFA Consulting Group Capacity : 52 kWp Date : 17 May 2022 - 12 September 2022 Location : 5 Politeknik Negeri in Indonesia
APDAL 1 & 2 Client : Kementerian ESDM, Ditjen EBTKE Capacity : 454.600 Ah Date : 31 August 2022 Location : Papua dan Papua Barat
Off-Grid Solar PV Systems – East Sumba, NTT
Pemprov NTT Dinas Energi dan Sumber Daya Mineral
Sumba Timur, NTT
Solar 2 Wave - Floating PV
Innovate UK
Gili Ketapang Island, East java
Power System Deployment for ZTE
PT. ZTE Indonesia
Jabodetabek, Sulawesi, Kalimantan
Solar-Powered Street Lighting System
EBTKE Kementrian ESDM
Indonesia (Region 2)
Off-Grid Solar PV System - Riau
PT. Surya Energi Indotama
Riau Islands
Solar Power System Installation
GFA Consulting Group
5 Politeknik Negeri In Indonesia
Freight Lift Installation
Evergreen Pasuruan Plant
Pasuruan Industrial Estate Rembang (PIER)
Passenger Lift Installation
Universitas Adzkia
Kota Padang
Hospital Lift Installation
RSIA Sitti Khadijah
Kota Gorontalo
Passenger Lift Installation
Kantor PT. Haleyora
Jakarta
Passenger Lift Installation
Kantor UTama JNE Gorontalo
Kota Gorontalo
please download our projects here